Page 7 of 24
MOTION TO APPROVE BY: UPDEGRAVE MOTION SECONDED BY: NIXON YES: MARTIN, NIXON, UPDEGRAVE, BRESSI ABSENT: CALOGERO
WHEREAS, the Township of Jackson previously awarded a contract to Lucas Construction Group, Inc. for the project known as “CY 2017 Road Improvements (Various Roadways)” in the amount of $1,338,338.00; and
WHEREAS, Township Engineer, Daniel Burke, has recommended the approval of As-Built/Close-Out Change Order No. 1 decreasing the contract by ($53,308.37) as a result of final as-built quantities (per attached “Schedule A”); and
WHEREAS, the approval of this As-Built/Close-Out Change Order #1 will result in the return of the performance guarantee posted for this project. The return of said performance guarantee will be contingent upon the posting and acceptance of the required Maintenance Guarantee, which will run for a period of one (1) year.
WHEREAS, it is now the desire of the Township Council to act upon the Engineer’s recommendation and to approve said Close-Out Change Order No. 1.
NOW, THEREFORE, BE IT RESOLVED by the Township Council of the Township of Jackson, County of Ocean and State of New Jersey, as follows:
DATED: 12-26-2017
MOTION TO APPROVE BILLS AND CLAIMS BY: MARTIN MOTION SECONDED BY: NIXON YES: MARTIN, NIXON, UPDEGRAVE, BRESSI ABSENT: CALOGERO ABSTAIN: NIXON (OCEAN COUNTY BOARD OF HEALTH), UPDEGRAVE (WINDING WAYS) CHECK# VENDOR AMOUNT