19
NEW BMPs FOR PRP/TMDL PLAN IMPLEMENTATION
Table 2. List all new structural BMPs installed and ongoing non-structural BMPs implemented during the reporting period that are being used toward achieving load reductions in the permittee's PRP and/or TMDL Plan (see instructions).
BMP No. BMP Name DA (ac) % Imp. BMP Extent Units Latitude Longitude Date Installed or Implemented Planning Area? Ch. 102? Annual Sediment Load Reduction (lbs/yr)
° ′ ″ ° ′ ″ ☐ ☐
° ′ ″ ° ′ ″ ☐ ☐
° ′ ″ ° ′ ″ ☐ ☐
° ′ ″ ° ′ ″ ☐ ☐
BMP INVENTORY FOR PRP/TMDL PLAN IMPLEMENTATION
Table 3. List all existing structural BMPs that have been installed in prior reporting periods and are eligible to use toward achieving load reductions in the permittee's PRP and/or TMDL Plan (see instructions).
BMP No. BMP Name DA (ac) % Imp. BMP Extent Units Latitude Longitude Date Installed Annual Sediment Load Reduction (lbs/yr) Date of Latest Inspect-ion Satisf-factory?
° ′ ″ ° ′ ″ ☐
° ′ ″ ° ′ ″ ☐
° ′ ″ ° ′ ″ ☐
° ′ ″ ° ′ ″ ☐
° ′ ″ ° ′ ″ ☐