3800-FM-BCW0491 9/2017 Annual MS4 Status Report
☐ Combined Chesapeake Bay / Impaired Waters PRPChesapeake Bay,
☐ Combined PRP / TMDL Plan
☐ Joint Plan (if checked, list the name of the MS4 group or names of all entities participating in the joint plan below) Joint Plan Participants:
2. Identify the pollutants of concern and pollutant load reduction requirements under the permit (see instructions).
Type of PlanTSS Load Reduction (lbs/yr)TP Load Reduction (lbs/yr)TN Load Reduction (lbs/yr)
☐ Chesapeake Bay PRP (Appendix D)
☒ Impaired Waters PRP (Appendix E)618,920N/AN/A
☐ TMDL Plan (Appendix F)
☐ Combined Chesapeake Bay / Impaired Waters PRP
☐ Combined PRP / TMDL Plan
3. Date Final Report Demonstrating Achievement of Pollutant Load Reductions Due: September 30, 2026 4. Have any modifications to the plan(s) occurred since DEP approval? ☐ Yes ☒ No If Yes to #4, was the updated plan(s) submitted to DEP? ☐ Yes ☐ No If Yes to #4, did you comply with the public participation requirements of the applicable appendix? ☐ Yes ☐ No If Yes to #4, describe the plan modifications.
5. Summary of progress achieved during reporting period. The Wilkins Run Stream Restoration design is nearing completion. The Joint Permit Application comments have been addressed and will be resubmitted for approval within a few weeks. The Township has purchased a property adjacent to the Wilkins Run site to allow easy access to the site during construction and for ongoing maintenance. 6. Anticipated activities for next reporting period. It is anticipated that we will receive the permit for the Wilkins Run Stream Restoration and will advertise bids for construction in the spring of 2022. Construction may begin as early as spring 2022.
PRP/TMDL Plan Comments: