| 3800-FM-BCW0491 9/2017
Annual MS4 Status Report |
| 3. Training topics covered:
The Good Housekeeping workshop consists of common stormwater pollution risks found on municipal public works yards, an overview of the MS4 permit, and a special focus on MCM3 and MCM6 on said permit. This is followed by a mock MS4 EPA audit.
Due to COVID-19 mitigation measures and travel limitations, a good housekeeping workshop was not feasible during this reporting period. A virtual avenue is being explored as an alternative during the next reporting period. |
| 4. Name(s) of training presenter(s):
Mike Hickman
5. Names of training attendees:
Gary Snyder, Mark Wells, Sean Kern, Joe Yatzor, Matt Waldinger, Anne Sokol, Matt Puda |
| MCM #6 Comments: |
| POLLUTANT CONTROL MEASURES (PCMs) |
| Indicate the status of implementing PCMs in Appendices A, B and/or C by completing the table below. Skip this section if PCMs are not applicable. |
| Task | Date Completed | Attached | Anticipated Completion Date |
|---|
| Storm Sewershed Map(s) | | ☐ | |
|---|
| Source Inventory | | ☐ | |
|---|
| Investigation of Suspected Sources | | ☐ | |
|---|
| Ordinance/SOP for Controlling Animal Wastes | | ☐ | |
|---|
| PCM Comments: |
| POLLUTANT REDUCTION PLANS (PRPs) AND TMDL PLANS |
| 1. Complete this section if the development and submission of a PRP and/or TMDL Plan was required as an attachment to the latest NOI or application or was required by the permit, regardless of whether DEP has approved the plan(s). |
| Type of Plan | Submission Date | DEP Approval Date | Surface Waters Addressed by Plan |
|---|
| ☐ Chesapeake Bay PRP (Appendix D) | | | Chesapeake Bay |
|---|
| ☒ Impaired Waters PRP (Appendix E) | 7/5/2018 | 12/2/2020 | Wilkins Run, Walnut Creek, Scott Run, Marshall Run, Mill Creek, West Branch of Cascade Creek |
|---|
| ☐ TMDL Plan (Appendix F) | | | |
|---|