relatively more difficult to gain participation requiring a contractor and crew to travel a considerable distance for work if ample opportunities are available without a travel requirement. Mobility restrictions associated with the on-going pandemic also contribute to these concerns. Accordingly, the airport is not inclined to add significantly to its base figure but is confident that a modest addition of 0.7% to an overall goal of 8.0% is achievable.
Sarasota Manatee Airport Authority will meet the maximum feasible portion of the overall goal by using race neutral means of facilitating DBE participation.
Sarasota Manatee Airport Authority estimates that in meeting the established overall goal of 8.0%, it will obtain 1.5% from race neutral participation and 6.5% through race conscious measures.
This breakout is based on the Authority's expectation, based on recent experience, that it will award at least one contract to a DBE prime contractor through competitive bid procedures. This contract is expected to represent at least 1.5% of the FAA-funded work during this goal-setting period. Therefore, 1.5% of the 8.0% goal is expected from race-neutral means, and the remaining 6.5% is expected to be race-conscious participation.
Sarasota Manatee Airport Authority will adjust the estimated breakout of race neutral and race conscious DBE participation as needed to reflect actual DBE participation (see §26.51(f)) and