Step 1. Base Figure -Relative Availability of DBEs per Statistical Data

The base figure for the relative availability was calculated as follows:

Method: DBE Directories

(https://fdotxwp02.dot.state.fl.us/EqualOpportunityOfficeBusinessDirectory/) and Census Bureau Data (https://factfinder.census.gov/faces/nav/jsf/pages/searchresults.xhtml).

Weighted Availability of DBE firms:

Project NameTrade DescriptionNAICSTrade ($)Total Firms Per CensusDBE Firms Per DirectoryDBE Availability (%)DBE ($)
Project 2021 Design TaxiwayEngineering Services541330$220,0001138464.04%$8,893
Charlie RehabilitationSurveying541370$30,000184137.07%$2,120
Total Project$250,0004.40%$11,012
Project 2021 Design TaxiwayEngineering Services541330$105,0001138464.04%$4,244
Alpha 4 & Alpha7 RehabilitationSurveying541370$20,000184137.07%$1,413
Total Project$125,0004.53%$5,657
Painted Traffic Markings237310$125,0001221411.48%$14,344
Project 2022 Construction Taxiway CharlieAsphalt Roadway237310$1,375,0001221411.48%$157,787
RehabilitationSite Preparation Contractors238910$500,000432184.17%$20,833
RehabilitationElectrical Contractors238210$275,0001499130.87%$2,385
RehabilitationCivil Engineer541330$225,0001138464.04%$9,095
Total Project$2,500,0008.18%$204,444
Painted Traffic Markings237310$40,0001221411.48%$4,590
Project 2022 Construction Taxiway Alpha 4 & Alpha7 RehabilitationAsphalt Roadway237310$440,0001221411.48%$50,492
RehabilitationSite Preparation Contractors238910$160,000432225.09%$8,148
RehabilitationElectrical Contractors238210$88,0001499130.87%$763
RehabilitationCivil Engineer541330$72,0001138464.04%$2,910
Total Project$800,0008.36%$66,904
Project 2022 Gate B-11 ImprovementsArchitectural Services541310$100,00039271.79%$1,786
RehabilitationSurveying541370$15,000184137.07%$1,060
Total Project$115,0002.47%$2,845
Project 2022 Design TaxiwayEngineering Services541330$155,0001138464.04%$6,265
Romeo 1, 2, and 3 RehabilitationSurveying541370$25,000184137.07%$1,766
Total Project$180,0004.46%$8,032
Project 2022 Design TaxiwayEngineering Services541330$225,0001138464.04%$9,095
RehabilitationSurveying541370$25,000184137.07%$1,766
Total Project$250,0004.34%$10,861