Step 1. Base Figure -Relative Availability of DBEs per Statistical Data
The base figure for the relative availability was calculated as follows:
(https://fdotxwp02.dot.state.fl.us/EqualOpportunityOfficeBusinessDirectory/) and Census Bureau Data (https://factfinder.census.gov/faces/nav/jsf/pages/searchresults.xhtml).
Weighted Availability of DBE firms:
| Project Name | Trade Description | NAICS | Trade ($) | Total Firms Per Census | DBE Firms Per Directory | DBE Availability (%) | DBE ($) |
|---|
| Project 2021 Design Taxiway | Engineering Services | 541330 | $220,000 | 1138 | 46 | 4.04% | $8,893 |
|---|
| Charlie Rehabilitation | Surveying | 541370 | $30,000 | 184 | 13 | 7.07% | $2,120 |
|---|
| Total Project | | | $250,000 | | | 4.40% | $11,012 |
|---|
| Project 2021 Design Taxiway | Engineering Services | 541330 | $105,000 | 1138 | 46 | 4.04% | $4,244 |
|---|
| Alpha 4 & Alpha7 Rehabilitation | Surveying | 541370 | $20,000 | 184 | 13 | 7.07% | $1,413 |
|---|
| Total Project | | | $125,000 | | | 4.53% | $5,657 |
|---|
| Painted Traffic Markings | 237310 | $125,000 | 122 | 14 | 11.48% | $14,344 |
|---|
| Project 2022 Construction Taxiway Charlie | Asphalt Roadway | 237310 | $1,375,000 | 122 | 14 | 11.48% | $157,787 |
|---|
| Rehabilitation | Site Preparation Contractors | 238910 | $500,000 | 432 | 18 | 4.17% | $20,833 |
|---|
| Rehabilitation | Electrical Contractors | 238210 | $275,000 | 1499 | 13 | 0.87% | $2,385 |
|---|
| Rehabilitation | Civil Engineer | 541330 | $225,000 | 1138 | 46 | 4.04% | $9,095 |
|---|
| Total Project | | | $2,500,000 | | | 8.18% | $204,444 |
|---|
| Painted Traffic Markings | 237310 | $40,000 | 122 | 14 | 11.48% | $4,590 |
|---|
| Project 2022 Construction Taxiway Alpha 4 & Alpha7 Rehabilitation | Asphalt Roadway | 237310 | $440,000 | 122 | 14 | 11.48% | $50,492 |
|---|
| Rehabilitation | Site Preparation Contractors | 238910 | $160,000 | 432 | 22 | 5.09% | $8,148 |
|---|
| Rehabilitation | Electrical Contractors | 238210 | $88,000 | 1499 | 13 | 0.87% | $763 |
|---|
| Rehabilitation | Civil Engineer | 541330 | $72,000 | 1138 | 46 | 4.04% | $2,910 |
|---|
| Total Project | | | $800,000 | | | 8.36% | $66,904 |
|---|
| Project 2022 Gate B-11 Improvements | Architectural Services | 541310 | $100,000 | 392 | 7 | 1.79% | $1,786 |
|---|
| Rehabilitation | Surveying | 541370 | $15,000 | 184 | 13 | 7.07% | $1,060 |
|---|
| Total Project | | | $115,000 | | | 2.47% | $2,845 |
|---|
| Project 2022 Design Taxiway | Engineering Services | 541330 | $155,000 | 1138 | 46 | 4.04% | $6,265 |
|---|
| Romeo 1, 2, and 3 Rehabilitation | Surveying | 541370 | $25,000 | 184 | 13 | 7.07% | $1,766 |
|---|
| Total Project | | | $180,000 | | | 4.46% | $8,032 |
|---|
| Project 2022 Design Taxiway | Engineering Services | 541330 | $225,000 | 1138 | 46 | 4.04% | $9,095 |
|---|
| Rehabilitation | Surveying | 541370 | $25,000 | 184 | 13 | 7.07% | $1,766 |
|---|
| Total Project | | | $250,000 | | | 4.34% | $10,861 |
|---|