1. Test results and documentation will be reviewed by the Engineer of Record and compared to the project documents. A log of the testing and results will be maintained and summarized at the completion of the project. AID/Terracon has established a budget of $20,000 for this testing according to Teracon's fee schedule (attached). This estimate includes quality assurance testing for the sitework, foundations and hangar slabs. No threshold inspections are included in this testing estimate.
  2. Review sitework quality control test results provided by the Contractor and the Owner.

We propose to provide these services for a Lump Sum Fee of $103,328.18 and Expenses of $4,650.40. Lump Sum Fee and Expenses breakdown by discipline and task per attached Fee Tables.

We hope this proposal meets with your approval and I am available to discuss with you or your staff any aspect of the information contained herein. SCHENKELSHULTZ is prepared to initiate start-up immediately on this project at the direction of Sarasota Manatee Airport Authority, and we are committed to servicing your Airport with our fullest capabilities. I look forward to hearing from you soon.

Sincerely,

SCHENKELSHULTZ, Inc.

Craig W. Hanson, AIA, LEED AP Principal

Attachments: Hourly fee charts by discipline and task, dated 01-13-2021