accordance with the contract documents. Further, Architect will notify the Owner of any such act, omission, or failure on the part of the Contractor observed by A/E team during on-site visits
Site visit reports will be prepared and distribute within 3 days of the site visit.
Level of Service:
Conduct one (1) site visit for substantial completion review by the A/E team. Prepare a punch list of items to be corrected prior to the final acceptance.
Substantial Completion punchlist
Level of Service:
Conduct one (1) site visit for final acceptance to review contractor's compliance and correction of the substantial completion punch list items.
Final Completion confirmation documentation.
Record drawings will be prepared incorporating construction changes and using information provided by the contractor via marked up field prints and field survey information. No field surveys are included in this task. Review of Contractor O&M manuals, warranty information and close out documents will be provided to ensure completeness and conformance to the specification documents.
Electronic PDF and AutoCAD versions of the record drawings.