SCHENKELSHULTZ □ □ □ ARCHITECTURE □ □

REV 1 January 13, 2021

Mr. Kent D. Bontrager, PE Senior Vice President Engineering, Planning & Facilities Sarasota Manatee Airport Authority 6000 Airport Circle Sarasota, FL 34243

Re: Proposal for Additional Services #4 Construction Administration Services Hangar C and Site Development

SRQ Maintenance Hangar Project Sarasota Bradenton International Airport Sarasota Manatee Airport Authority Commission No. 190721

Dear Mr. Bontrager:

SCHENKELSHULTZ appreciates the opportunity to submit our Proposal for Additional Professional Architectural and Engineering Services for the above referenced project for your consideration. The scope of work for these additional services includes:

Task 8- Construction Phase Services

8.A PreConstruction Meeting on-site

Level of Service:

Schenkel Shultz Architecture will attend an on-site preconstruction meeting to coordinate on project approach, discuss contractor logistics, schedule and requirements for items noted below.

Deliverables Pre Construction meeting agenda, sign in sheet and notes will be prepared and distributed by electronic PDF.

8.B.1 Contractor Request for Information (RFI I)

Level of Service:

Review contractor request for information and provide clarification of design intent

Deliverables:

Returned RFI's with a response.

8.B.2 Contractor Submittals

Level of Service:

Review contractor submittals for general conformance with a design concept. Each submittal will be reviewed initially. One subsequent review of a corrected or alternate submittal or required by non-conformance by the contractor is included.

Deliverables:

Review and return submittals with action indicated stamp.

8.B.3 Evaluate Contractor Pay Requests

Level of Service:

Review contractor pay request based on test results and periodic on site observation and recommended payment including adjustments in accordance with the contract documents

Deliverables: