TERRACON CONSULTANTS, INC.
2020 FEE SCHEDULE -SARASOTA
MATERIALS TESTING
UNIT RATE
DESCRIPTION OF WORK
TECHNICAL AND PROFESSIONAL STAFF
- A.Chief Engineer/Chief Scientist/Chief Geologist Per Hour $
- B.Principal Engineer/Principal Scientist/Principal Geologist Per Hour $
- C.Senior Engineer/Senior Project Manager/Senior Geologist/Senior Scientist Per Hour $
- D.Project Manager/Project Engineer/Project Geologist/Project Scientist Per Hour $
- E.Assistant Project Manager/Staff Engineer/Assistant Project Geologist/Assistant Project Scientist Per Hour $
- F.Chief Field Technician/Chief Engineering Technician/Chief Environmental Technician Per Hour $
- G.Senior Field Technician/Senior Engineering Technician/Senior Environmental Technician Per Hour $
- H.Field Technician/Engineering Technician/Environmental Technician Per Hour $
- I.Soils Technician/Concrete Technician Per Hour $
- J.CADD Operator Per Hour $
- K.Administrative Assistant Per Hour $
NOTES
- Hourly rates are portal to portal.
- I.Hourly rates are portal to portal.
- Stand-by time and cancellation without prior notice will be invoiced at the appropriate hourly rate.
- An overtime multiplier of 1.5 will be applied to the above rates for any work performed between 6:00 p.m. to 7:00 a.m. weekends, holidays and over 8 hours per day.
- Rates for services not listed will be provided as requested.
- B.Field Support Vehicle Per Day $ 85.00
- C.Lodging, per person (subject to change dependent on geographical area) Per Day $ 120.00
- D.Per Diem, per person Per Day $ 50.00
- A.Automobile Travel (non-rental) Per Mile $ 0.65
TRAVEL EXPENSES
MATERIALS TESTING SERVICES
I. SOILS
II. CONCRETE
- A.Field Services
- I.In-Place Density Test
- Sampling
- B.Laboratory Services
- I.Modified or Standard Proctor Test
- Florida Bearing Value (FBV) Test
- LBR or CBR Test (including Modified Proctor)
- Full Grain Size (excluding #200 Sieve)
- Wash Through #200 Sieve
- Natural Moisture Content
- Organic Content
- Liquid and Plastic Limits
- pH Test
A. Field Services
Field Services
- Sampling, Slump Testing, Molding Cylinders for Compressive Strength Tests, Hourly Tech Rate
- Temperature Testing, Air Content Tests, and Cylinder Pick- (up to 4 cylinders per set) Per Hour Tech Rate
- Flexural Strength Beams (up to 3 per set) Hourly Tech Rate
- Coring (Vertical Coring) - Equipment Mobilization Per Trip $ 250.00
Coring Fee (per person) Per Hour Tech Rate