Attachment C

Paving and Geometry Plans-$-
Paving Details-$-
Stormwater Modeling-$-
Grading and Drainage Analysis-$-
Grading and Drainage Plans-$-
Pavement Marking and Signage Plan-$-
Water & Sewer Utility Plan-$-
Landscape and Irrigation Plan-$-
Remediation Plans-$-
Fencing Plan-$-

Landscape Design Plan - Fencing Plan

Total Hours per Position

3.2 Design Development Design Documents

(RAC, Overflow Parking Lot, Cell Lot, & Future RV & Boat Storage)

Meetings - Six (6) Virtual, Two (2) in person workshopModeling/Rendering60% Deliverable Documents Prep and SubmissionBuilding Code Review UpdateDesign Report Criteria/AnalysisDesign Report CalculationsDesign Development Report

Design Report Calculations for Evaluation of Airport Master Lit Station (Includes standalone review and meeting with Airport and Utilities Dept.)Design Report Water & Sewer Utility AnalysisDesign Report Storm Coll Sys Anal (Pond Routing Analysis (Modeling) excluded)Design Development Drift Technical SpecificationsPhase II Environmental Site Assessment (ESA)Environmental Resource Permit & Water Consumption Permit (Reclaim)Site Plan PermitUtility Plan County Coordination & PermittingFDEP Water Permit PreparationFDEP Wastewater Permit PreparationBuilding Permit Code Review Meeting with A&UPeer Review / Quality ControlSite/Civil Quantity Take-offTotal Hours per Position - Task 3Subtotal 3 per Position - Task 3

3.3 Other Direct Costs

ESA Field Testing and Sampling

Meeting Costs

Printing/Copying Subtotal ODCS

Total Task 3 per Position

Task 4 - Construction Document (95%)

4.1 Construction Document (95%) Plans - Civil(RAC, Overflow Parking Lot, Cell Lot, & Future RV & Boat Storage)

Cover Sheet

Index of DrawingsGeneral Notes

Site Plan

Planning / MOT Plans

Cleaning and Grubbing / Demolition Plans

Demolition/Site Crewout Plans of Existing FacilitiesErosion Control Plan

Stormwater Pollution Prevention Plan (SWPPP)

Typical Section Including Pavement Design/Paving and Geometry Plans

Stormwater ModelingGrading and Drainage AnalysisGrading and Drainage PlansPeavement Marking and Signage DetailsWater & Sewer Utility Plan

Landscape and Insignification PlansFencing Plan

Total Hours per Position

4.2 Construction Document (95%) Design Documents

Meetings - Three (3) Virtual, One (1) in person workshopModeling/Rendering95% Deliverable Documents Prep and SubmissionBuilding Code Review UpdateDesign Report Criteria/AnalysisDesign Report CalculationsConstruction Document Design Report

Design Report Calculations for Evaluation of Airport Master Lit Station (Includes standalone review and meeting with Airport and Utilities Dept.)Design Report Water & Sewer Utility AnalysisDesign Report Storm Coll Sys Anal (Pond Routing Analysis (Modeling) excluded)Construction Document Technical SpecificationsEnvironmental Resource Permit & Water Consumption Permit (Reclaim)Site Plan PermitUtility Plan County Coordination & PermittingFDEP Water Permit PreparationBuilding Permit Code Review Meeting with A&UPeer Review / Quality ControlSite/Civil Quantity Take-offTotal Hours per Position

Subtotal Hours per Position - Task 4Subtotal 3 per Position - Task 4

4.3 Other Direct Costs

Meeting Costs

Printing/Copying