Attachment C
| Paving and Geometry Plans | | | | | | - | $ | - |
|---|
| Paving Details | | | | | | - | $ | - |
|---|
| Stormwater Modeling | | | | | | - | $ | - |
|---|
| Grading and Drainage Analysis | | | | | | - | $ | - |
|---|
| Grading and Drainage Plans | | | | | | - | $ | - |
|---|
| Pavement Marking and Signage Plan | | | | | | - | $ | - |
|---|
| Water & Sewer Utility Plan | | | | | | - | $ | - |
|---|
| Landscape and Irrigation Plan | | | | | | - | $ | - |
|---|
| Remediation Plans | | | | | | - | $ | - |
|---|
| Fencing Plan | | | | | | - | $ | - |
|---|
Landscape Design Plan - Fencing Plan
Total Hours per Position
3.2 Design Development Design Documents
(RAC, Overflow Parking Lot, Cell Lot, & Future RV & Boat Storage)
Meetings - Six (6) Virtual, Two (2) in person workshopModeling/Rendering60% Deliverable Documents Prep and SubmissionBuilding Code Review UpdateDesign Report Criteria/AnalysisDesign Report CalculationsDesign Development Report
Design Report Calculations for Evaluation of Airport Master Lit Station (Includes standalone review and meeting with Airport and Utilities Dept.)Design Report Water & Sewer Utility AnalysisDesign Report Storm Coll Sys Anal (Pond Routing Analysis (Modeling) excluded)Design Development Drift Technical SpecificationsPhase II Environmental Site Assessment (ESA)Environmental Resource Permit & Water Consumption Permit (Reclaim)Site Plan PermitUtility Plan County Coordination & PermittingFDEP Water Permit PreparationFDEP Wastewater Permit PreparationBuilding Permit Code Review Meeting with A&UPeer Review / Quality ControlSite/Civil Quantity Take-offTotal Hours per Position - Task 3Subtotal 3 per Position - Task 3
3.3 Other Direct Costs
ESA Field Testing and Sampling
Meeting Costs
Printing/Copying Subtotal ODCS
Total Task 3 per Position
Task 4 - Construction Document (95%)
4.1 Construction Document (95%) Plans - Civil(RAC, Overflow Parking Lot, Cell Lot, & Future RV & Boat Storage)
Cover Sheet
Index of DrawingsGeneral Notes
Site Plan
Planning / MOT Plans
Cleaning and Grubbing / Demolition Plans
Demolition/Site Crewout Plans of Existing FacilitiesErosion Control Plan
Stormwater Pollution Prevention Plan (SWPPP)
Typical Section Including Pavement Design/Paving and Geometry Plans
Stormwater ModelingGrading and Drainage AnalysisGrading and Drainage PlansPeavement Marking and Signage DetailsWater & Sewer Utility Plan
Landscape and Insignification PlansFencing Plan
Total Hours per Position
4.2 Construction Document (95%) Design Documents
Meetings - Three (3) Virtual, One (1) in person workshopModeling/Rendering95% Deliverable Documents Prep and SubmissionBuilding Code Review UpdateDesign Report Criteria/AnalysisDesign Report CalculationsConstruction Document Design Report
Design Report Calculations for Evaluation of Airport Master Lit Station (Includes standalone review and meeting with Airport and Utilities Dept.)Design Report Water & Sewer Utility AnalysisDesign Report Storm Coll Sys Anal (Pond Routing Analysis (Modeling) excluded)Construction Document Technical SpecificationsEnvironmental Resource Permit & Water Consumption Permit (Reclaim)Site Plan PermitUtility Plan County Coordination & PermittingFDEP Water Permit PreparationBuilding Permit Code Review Meeting with A&UPeer Review / Quality ControlSite/Civil Quantity Take-offTotal Hours per Position
Subtotal Hours per Position - Task 4Subtotal 3 per Position - Task 4
4.3 Other Direct Costs
Meeting Costs
Printing/Copying