Attachment C
3.2 Design Development Design Documents
(RAC, Overflow Parking Lot, Cell Lot, & Future RV & Boat Storage)
Stormwater Modeling - -
Grading and Drainage Analysis - -
Grading and Drainage Plans - -
Payment Marking and Signage Plan - -
Water & Sewer Utility Plan - -
Landscape and Irrigation Plan 10 30 30 70 8,450.00
Remediation Plans - -
Fencing Plan - -
Total Hours per Position 10 30 30 70 8,450.00
3.2 Design Development Design Documents
(RAC, Overflow Parking Lot, Cell Lot, & Future RV & Boat Storage)
Project Management - -
Meetings - Six (6) Virtual, Two (2) in person workshop Modeling/Rendeings - -
60% Deliverable Documents Prep and Submission 6 6 12 1,320.00
Building Code Review Update - -
Design Report Criteria/Analysis - -
Design Report Calculations - -
Design Development Report 3 3 3 375.00
Design Report Calculations for Evaluation of Airport Master Liht Station (Includes stand-alone review and meeting with Airport and Utilities Dept.) - -
Design Report Water & Sewer Utility Analysis - -
Design Report Storm Coll Sys Anal (Pond Routing Analysis (Modelling) excluded) - -
Design Development Draft Technical Specifications - -
Phase II Environmental Site Assessment (ESA) - -
Environmental Resource Permit & Water Consumption Permit (Reclaim) - -
Site Plan Permit - -
Utility Plan County Coordination & Permitting - -
FEP Water Permit Preparation - -
FDEP Wastewater Permit Preparation - -
Building Permit Code Review Meeting with AHJ - -
Peer Review / Quality Control 6 6 1,110.00
Site/Civil Quantity Take-off 8 8 760.00
Preparation of 7460 - -
Total Hours per Position 6 9 14 29 3,565.00
Subtotal Hours per Position - Task 3 16 39 44 99
Subtotal $ per Position - Task 3 2,960 4,875 4,180 112,015.00
3.3 Other Direct Costs
ESA Field Testing and Sampling $0.00
Meeting Costs - - - $0.00
Printing/Copying - - - $0.00
Subtotal ODCs - - - $0.00
Total Task 3 per Position 2,960 4,875 4,180 112,015.00
4.1 Construction Document (95%)
(RAC, Overflow Parking Lot, Cell Lot, & Future RV & Boat Storage)
Cover Sheet - -
Index of Drawings - -
General Notes - -
Site Plan - -
Plasing / MOT Plans - -
Clearing and Grubbing / Demolition Plans - -
Demolition/Site Closeout Plans of Existing Facilities - -
Erosion Control Plan - -
Stormwater Pollution Prevention Plan (SWPPP) - -
Typical Section Including Pavement Design - -
Paving and Geometry Plans - -
Stormwater Modeling - -
Grading and Drainage Analysis - -
Grading and Drainage Plans - -
Grading and Drainage Details - -
Pavement Marking and Signage Plan - -
Pavement Marking and Signage Details - -
Water & Sewer Utility Plan - -
Water & Sewer Utility Details - -
Landscape and Irrigation Plan 19 43 35 97 12,215.00
Remediation Plans - -
Fencing Plan - -
Total Hours per Position 19 43 35 97 12,215.00
4.2 Construction Document (95%) Design Documents
Project Management - -
Meetings - Three (3) Virtual, One (1) in person workshop Modeling/Rendeings - -
95% Deliverable Documents Prep and Submission 6 6 12 1,320.00
Building Code Review Update - -
Design Report Criteria/Analysis - -
Construction Document Design Report - -
Design Report Master Lift Station (Includes stand-alone review and meeting with Airport and Utilities Dept.) - -
Design Report Water & Sewer Utility Analysis - -
Construction Document Modeling (excluded) - -
Construction Document Technical Specifications - -
Environmental Resource Permit & Water Consumption Permit (Reclaim) - -
Site Plan Permit - -
Utility Plan County Coordination & Permitting 3 3 375.00
FDEP Water Permit Preparation - -
FDEP Wastewater Permit Preparation - -
Building Permit Code Review Meeting with AHJ - -
Peer Review / Quality Control 6 - -
StatorCivil Quantity Take-off - -
Total Hours per Position 6 9 14 29 760.00
Subtotal Hours per Position - Task 4 25 52 49 126
Subtotal $ per Position - Task 4 4,625 6,500 4,655 115,780.00
Meeting Costs - - - $0.00
Printing/Copying - - - $0.00
4.3 Other Direct Costs