Attachment C

3.2 Design Development Design Documents

(RAC, Overflow Parking Lot, Cell Lot, & Future RV & Boat Storage)

Stormwater Modeling - -

Grading and Drainage Analysis - -

Grading and Drainage Plans - -

Payment Marking and Signage Plan - -

Water & Sewer Utility Plan - -

Landscape and Irrigation Plan 10 30 30 70 8,450.00

Remediation Plans - -

Fencing Plan - -

Total Hours per Position 10 30 30 70 8,450.00

3.2 Design Development Design Documents

(RAC, Overflow Parking Lot, Cell Lot, & Future RV & Boat Storage)

Project Management - -

Meetings - Six (6) Virtual, Two (2) in person workshop Modeling/Rendeings - -

60% Deliverable Documents Prep and Submission 6 6 12 1,320.00

Building Code Review Update - -

Design Report Criteria/Analysis - -

Design Report Calculations - -

Design Development Report 3 3 3 375.00

Design Report Calculations for Evaluation of Airport Master Liht Station (Includes stand-alone review and meeting with Airport and Utilities Dept.) - -

Design Report Water & Sewer Utility Analysis - -

Design Report Storm Coll Sys Anal (Pond Routing Analysis (Modelling) excluded) - -

Design Development Draft Technical Specifications - -

Phase II Environmental Site Assessment (ESA) - -

Environmental Resource Permit & Water Consumption Permit (Reclaim) - -

Site Plan Permit - -

Utility Plan County Coordination & Permitting - -

FEP Water Permit Preparation - -

FDEP Wastewater Permit Preparation - -

Building Permit Code Review Meeting with AHJ - -

Peer Review / Quality Control 6 6 1,110.00

Site/Civil Quantity Take-off 8 8 760.00

Preparation of 7460 - -

Total Hours per Position 6 9 14 29 3,565.00

Subtotal Hours per Position - Task 3 16 39 44 99

Subtotal $ per Position - Task 3 2,960 4,875 4,180 112,015.00

3.3 Other Direct Costs

ESA Field Testing and Sampling $0.00

Meeting Costs - - - $0.00

Printing/Copying - - - $0.00

Subtotal ODCs - - - $0.00

Total Task 3 per Position 2,960 4,875 4,180 112,015.00

4.1 Construction Document (95%)

(RAC, Overflow Parking Lot, Cell Lot, & Future RV & Boat Storage)

Cover Sheet - -

Index of Drawings - -

General Notes - -

Site Plan - -

Plasing / MOT Plans - -

Clearing and Grubbing / Demolition Plans - -

Demolition/Site Closeout Plans of Existing Facilities - -

Erosion Control Plan - -

Stormwater Pollution Prevention Plan (SWPPP) - -

Typical Section Including Pavement Design - -

Paving and Geometry Plans - -

Stormwater Modeling - -

Grading and Drainage Analysis - -

Grading and Drainage Plans - -

Grading and Drainage Details - -

Pavement Marking and Signage Plan - -

Pavement Marking and Signage Details - -

Water & Sewer Utility Plan - -

Water & Sewer Utility Details - -

Landscape and Irrigation Plan 19 43 35 97 12,215.00

Remediation Plans - -

Fencing Plan - -

Total Hours per Position 19 43 35 97 12,215.00

4.2 Construction Document (95%) Design Documents

Project Management - -

Meetings - Three (3) Virtual, One (1) in person workshop Modeling/Rendeings - -

95% Deliverable Documents Prep and Submission 6 6 12 1,320.00

Building Code Review Update - -

Design Report Criteria/Analysis - -

Construction Document Design Report - -

Design Report Master Lift Station (Includes stand-alone review and meeting with Airport and Utilities Dept.) - -

Design Report Water & Sewer Utility Analysis - -

Construction Document Modeling (excluded) - -

Construction Document Technical Specifications - -

Environmental Resource Permit & Water Consumption Permit (Reclaim) - -

Site Plan Permit - -

Utility Plan County Coordination & Permitting 3 3 375.00

FDEP Water Permit Preparation - -

FDEP Wastewater Permit Preparation - -

Building Permit Code Review Meeting with AHJ - -

Peer Review / Quality Control 6 - -

StatorCivil Quantity Take-off - -

Total Hours per Position 6 9 14 29 760.00

Subtotal Hours per Position - Task 4 25 52 49 126

Subtotal $ per Position - Task 4 4,625 6,500 4,655 115,780.00

Meeting Costs - - - $0.00

Printing/Copying - - - $0.00

4.3 Other Direct Costs