PROJECT/TASK: SRQ CONRAC FACILITY DESIGN SITE/CIVIL DESIGN SERVICES

CONSULTANT FEE STRUCTURE

1/11/2021

$52,990.00

LANDSCAPE ARCHITECTURE$32,990.00
Hourly RateSr. Landscape Architect IIIIrrigation DesignerCAD Technician IITOTAL HRS
Task 1 - Programming / Pre-Design Services (10%)$ 185.00$ 125.00$ 95.00
1.1 Project Initiation (RAC, Overflow Parking Lot, Cell Lot, & Future RV & Boat Storage)
Meetings - Four (4) Virtual, One (1) in person workshop-$-
Data Collection and Existing Documentation Review-$-
Design Concept Validation and Project Baseline-$-
Initial Review of AHJ Codes-$-
Preparation of Land Survey, Geotechnical, and Environmental Analysis224$620.00
Peer Review / Quality Control-$-
Rough Order of Maantitude Site/Civil Quantity Take-off-$-
Total Hours per Position22-4$620.00
Subtotal Hours per Position - Task 12-4
Subtotal $ per Position - Task 1$ 370$ 250-$620.00
1.2 Other Direct Costs
Meeting Costs$ -$ -$ -$0.00
Printing/Copying$ -$ -$ -$0.00
Subtotal ODCs$ -$ -$ -$0.00
Total Task 1 per Position370250-$620.00
Task 2 - Schematic (30%) Design
2.1. Schematic Design Plans - Civil (RAC, Overflow Parking Lot, Cell Lot, & Future RV & Boat Storage)
Cover Sheet-$-
Index of Drawings-$-
General Notes-$-
Site Plan-$-
Preliminary Phasing Plans-$-
Clearing and Grubbing / Demolition Plans-$-
Demolition/Site Closeout Plans of Existing Facilities-$-
Typical Section Including Pavement Design-$-
Paving and Geometry Plans-$-
Stormwater Modeling-$-
Grading and Drainage Analysis-$-
Grading and Drainage Plans-$-
Pavement Marking and Signage Plan-$-
Water & Sewer Utility Plan-$-
Landscape Plan6182448$5,640.00
Remediation Plans-$-
Fencing Plan-$-
Total Hours per Position6182448$5,640.00
2.2 Schematic Design Documents
(RAC, Overflow Parking Lot, Cell Lot, & Future RV & Boat Storage)
Project Management-$-
Meetings - Six (6) Virtual, Two (2) in person workshop-$-
30% Deliverable Documents Prep and Submission6612$1,320.00
Modeling/Rendering-$-
Building Code Review Update-$-
Design Report Criteria/Analysis-$-
Design Report Calculations-$-
Design Outline Specifications-$-
Phase I ESA Regulatory Review-$-
Phase I ESA Regulatory-$-
Phase I ESA Reconnaissance-$-
Phase I ESA Report-$-
Building Assessment of Existing Rental Car Facilities-$-
Site Topographic SUE-$-
Site Topographic Survey-$-
Peer Review / Quality Control66$1,110.00
Site/Civil Quantity Take-off448$880.00
Total Hours per Position6101026$3,310.00
Subtotal Hours per Position - Task 212283474
Subtotal $ per Position - Task 2$ 2,220.00$ 3,500.00$ 3,230.00$8,950.00
2.3 Other Direct Costs
Direct Field Costs for Phase I ESA$ -$ -$ -$0.00
Direct Field Costs for SUETOPO$ -$ -$ -$0.00
Meeting Costs$ -$ -$ -$0.00
Printing/Copying$ -$ -$ -$0.00
Subtotal ODCs$ -$ -$ -$0.00
Total Task 2 per Position$ 2,220$ 3,500$ 3,230$8,950.00
Task 3 - Design Development (60%)
3.1 Design Development Plans - Civil (RAC, Overflow Parking Lot, Cell Lot, & Future RV & Boat Storage)
Cover Sheet-$-
Index of Drawings-$-
General Notes-$-
Site Plan-$-
Phasing / MOT Plans-$-
Clearing and Grubbing / Demolition Plans-$-
Demolition/Site Closeout Plans of Existing Facilities-$-
Erosion Control Plan-$-
Stormwater Pollution Prevention Plan (SWPPP)-$-
Typical Section Including Pavement Design-$-