| LANDSCAPE ARCHITECTURE | $32,990.00 | |||||
| Hourly Rate | Sr. Landscape Architect III | Irrigation Designer | CAD Technician II | TOTAL HRS | ||
|---|---|---|---|---|---|---|
| Task 1 - Programming / Pre-Design Services (10%) | $ 185.00 | $ 125.00 | $ 95.00 | |||
| 1.1 Project Initiation (RAC, Overflow Parking Lot, Cell Lot, & Future RV & Boat Storage) | ||||||
| Meetings - Four (4) Virtual, One (1) in person workshop | - | $ | - | |||
| Data Collection and Existing Documentation Review | - | $ | - | |||
| Design Concept Validation and Project Baseline | - | $ | - | |||
| Initial Review of AHJ Codes | - | $ | - | |||
| Preparation of Land Survey, Geotechnical, and Environmental Analysis | 2 | 2 | 4 | $ | 620.00 | |
| Peer Review / Quality Control | - | $ | - | |||
| Rough Order of Maantitude Site/Civil Quantity Take-off | - | $ | - | |||
| Total Hours per Position | 2 | 2 | - | 4 | $ | 620.00 |
| Subtotal Hours per Position - Task 1 | 2 | - | 4 | |||
| Subtotal $ per Position - Task 1 | $ 370 | $ 250 | - | $620.00 | ||
| 1.2 Other Direct Costs | ||||||
| Meeting Costs | $ - | $ - | $ - | $0.00 | ||
| Printing/Copying | $ - | $ - | $ - | $0.00 | ||
| Subtotal ODCs | $ - | $ - | $ - | $0.00 | ||
| Total Task 1 per Position | 370 | 250 | - | $620.00 | ||
| Task 2 - Schematic (30%) Design | ||||||
| 2.1. Schematic Design Plans - Civil (RAC, Overflow Parking Lot, Cell Lot, & Future RV & Boat Storage) | ||||||
| Cover Sheet | - | $ | - | |||
| Index of Drawings | - | $ | - | |||
| General Notes | - | $ | - | |||
| Site Plan | - | $ | - | |||
| Preliminary Phasing Plans | - | $ | - | |||
| Clearing and Grubbing / Demolition Plans | - | $ | - | |||
| Demolition/Site Closeout Plans of Existing Facilities | - | $ | - | |||
| Typical Section Including Pavement Design | - | $ | - | |||
| Paving and Geometry Plans | - | $ | - | |||
| Stormwater Modeling | - | $ | - | |||
| Grading and Drainage Analysis | - | $ | - | |||
| Grading and Drainage Plans | - | $ | - | |||
| Pavement Marking and Signage Plan | - | $ | - | |||
| Water & Sewer Utility Plan | - | $ | - | |||
| Landscape Plan | 6 | 18 | 24 | 48 | $ | 5,640.00 |
| Remediation Plans | - | $ | - | |||
| Fencing Plan | - | $ | - | |||
| Total Hours per Position | 6 | 18 | 24 | 48 | $ | 5,640.00 |
| 2.2 Schematic Design Documents | ||||||
| (RAC, Overflow Parking Lot, Cell Lot, & Future RV & Boat Storage) | ||||||
| Project Management | - | $ | - | |||
| Meetings - Six (6) Virtual, Two (2) in person workshop | - | $ | - | |||
| 30% Deliverable Documents Prep and Submission | 6 | 6 | 12 | $ | 1,320.00 | |
| Modeling/Rendering | - | $ | - | |||
| Building Code Review Update | - | $ | - | |||
| Design Report Criteria/Analysis | - | $ | - | |||
| Design Report Calculations | - | $ | - | |||
| Design Outline Specifications | - | $ | - | |||
| Phase I ESA Regulatory Review | - | $ | - | |||
| Phase I ESA Regulatory | - | $ | - | |||
| Phase I ESA Reconnaissance | - | $ | - | |||
| Phase I ESA Report | - | $ | - | |||
| Building Assessment of Existing Rental Car Facilities | - | $ | - | |||
| Site Topographic SUE | - | $ | - | |||
| Site Topographic Survey | - | $ | - | |||
| Peer Review / Quality Control | 6 | 6 | $ | 1,110.00 | ||
| Site/Civil Quantity Take-off | 4 | 4 | 8 | $ | 880.00 | |
| Total Hours per Position | 6 | 10 | 10 | 26 | $ | 3,310.00 |
| Subtotal Hours per Position - Task 2 | 12 | 28 | 34 | 74 | ||
| Subtotal $ per Position - Task 2 | $ 2,220.00 | $ 3,500.00 | $ 3,230.00 | $8,950.00 | ||
| 2.3 Other Direct Costs | ||||||
| Direct Field Costs for Phase I ESA | $ - | $ - | $ - | $0.00 | ||
| Direct Field Costs for SUETOPO | $ - | $ - | $ - | $0.00 | ||
| Meeting Costs | $ - | $ - | $ - | $0.00 | ||
| Printing/Copying | $ - | $ - | $ - | $0.00 | ||
| Subtotal ODCs | $ - | $ - | $ - | $0.00 | ||
| Total Task 2 per Position | $ 2,220 | $ 3,500 | $ 3,230 | $8,950.00 | ||
| Task 3 - Design Development (60%) | ||||||
| 3.1 Design Development Plans - Civil (RAC, Overflow Parking Lot, Cell Lot, & Future RV & Boat Storage) | ||||||
| Cover Sheet | - | $ | - | |||
| Index of Drawings | - | $ | - | |||
| General Notes | - | $ | - | |||
| Site Plan | - | $ | - | |||
| Phasing / MOT Plans | - | $ | - | |||
| Clearing and Grubbing / Demolition Plans | - | $ | - | |||
| Demolition/Site Closeout Plans of Existing Facilities | - | $ | - | |||
| Erosion Control Plan | - | $ | - | |||
| Stormwater Pollution Prevention Plan (SWPPP) | - | $ | - | |||
| Typical Section Including Pavement Design | - | $ | - | |||