Initial review of overall code issues and assumptions. Discuss alternative procurement methods for equipment and systems.
Preparation of land survey and geotechnical and environmental analysis of the proposed site(s), once the developable area has been defined in the planning / pre-design phase, and the re-platting of sites for a continuous project site for development. Environmental analysis, Phases 1 and 2, as bests to testing and reporting, monitoring well, drilling and reporting, will be included as an additional service, as needed.
Deliverables:
Summary of Site/Civil Project Design Criteria
Report on the Qualitative/Performance based “program” for primary components (sizing goals and planning parameters)
Summary of findings defining the scope of the project, conceptual approach and an opinion of probable construction cost
3. Schematic Design (30%)
Under this task the Consultant will perform planning, coordination, field work, preliminary studies and schematic plan development necessary to evaluate, align and expand previous planning work relative to Pre-Design findings with a focus on the primary aspects in common to each of the project construction phase areas. At this phase, the design will include enough of the project design components to reflect the project goals and objectives while still allowing for modifications. This phase of the design will include the development of base drawings and CAD/Civil 3D models of civil / site design. AutoCAD 2018 or newer shall be used for civil designs. The Schematic Design submittal will include the following:
Cover Sheet
Index of Drawings
General Notes
Site Plan
Preliminary Phasing
Clearing and Grubbing / Demolition Plan
Demolition/Site Closeout Plans of Existing Facilities
Typical Sections including Pavement Design
Paving and Geometry Plan
Grading and Drainage Analysis and Plan (including Stormwater Modeling)
Pavement Marking and Signage Plan
Water & Sewer Utility Plan
Landscape Plan
Remediation Plans
Fencing Plan
The Consultant's PM and/or appropriate technical leads will prepare for and attend approximately six (6) web-based owner optional workshop/ progress meetings and two (2) in person workshop/presentation meeting.
Perform topographical survey of the proposed site.
Perform underground survey utilities of the proposed site.