SRQ Rental Car Quick Turnaround Area and Surrounding Projects Sarasota Bradenton International Airport
Exhibit C - Fee Proposal - Team Synopsis - REVISED V3
1/12/2021
Firms and Disciplines Project Phases Other Services Subtotals % of Overall Fee
10% Design 30% SD 60% DD 95% CD 100% CD Bid/Permit CA
Rental Car Planning $ 22,000 $ 16,500 $ 11,000 $ 5,500 - na 55,000 3.24%
Architecture and Interiors $ 44,500 $ 89,000 $ 133,500 $ 133,500 $ 44,500 na $ 445,000 26.19%
Masters Consulting Engineers
PGAL
Project Management $ 13,000 $ 16,250 $ 9,750 $ 13,000 $ 13,000 na $ 65,000 3.83%
Stantec
Atkins North America
Site Topographic SUE and Survey na $ 90,145 $ 90,145 5.31%
Landscape Architecture $ 620 $ 9,750 $ 12,825 $ 25,805 $ 4,000 na $ 53,000 3.12%
ESA - Phases 1 and 2 ( to be provided as needed as a contract amendment) $ - 0.00%
TLC Engineering Solutions
Electrical $ 3,893 $ 11,927 $ 24,028 $ 14,180 $ 1,884 na $ 55,912 3.29%
Plumbing $ 408 $ 4,996 $ 7,137 $ 3,875 $ 1,224 na $ 17,640 1.04%
Fire Protection $ 494 $ 3,336 $ 4,695 $ 4,226 $ 741 na $ 13,492 0.79%
Technology $ 5,254 $ 9,776 $ 18,212 $ 11,780 $ 2,277 na $ 47,299 2.78%
Mechanical $ 6,860 $ 11,624 $ 19,294 $ 18,136 $ 4,080 na $ 59,994 3.53%
Asbestos Demolition Survey and Screening (to be completed by separate contractor, per discussions with SMAA) $ - 0.00%
Geotechnical Engineering $ 29,562 $ 29,562 1.74%
Structural Engineering $ 7,000 $ 16,000 $ 30,000 $ 35,000 $ 8,000 na $ 96,000 5.65%
Fueling and Systems Engineering $ 12,200 $ 24,400 $ 24,400 $ 48,800 $ 12,200 na $ 106,000 6.24%
Civil Engineering $ 34,305 $ 110,755 $ 159,075 $ 182,845 $ 28,310 na $ 515,290 30.33%
Tierra
National Environmental Technology
Monitoring Wells - Drilling and Reporting (to be provided by separate contractor, per discussions with SMAA) $ - 0.00%
Reimbursable Expenses
Estimate, based on approximately 3.0% of overall fee $ 49,480 2.91%
Totals $ 150,534 $ 324,314 $ 453,916 $ 496,647 $ 120,216 $ - $ 119,707 $ 1,698,814 100.00%
Notes: Construction Costs Fee %
1 Fee proposal includes full design services as outlined in the detailed scope of work and design deliverables $ 12,000,000 13.74%
$ 15,000,000 $ 18,000,000 11.00%
$ 18,000,000 9.16%