J. ENERGY:
- a.a. Updated energy report
K. GENERAL:
- a.As documents develop, confer with regulatory agencies such as:
- b.Identify all documents with project number and date
- c.Finalize the building design program, scope of work and verify compliance through the project quality assurance / quality control program
- d.Actions for the civil, mechanical and electrical engineers:
- i.Fire Marshal (state and local)
- ii.Department of Health
- iii.City and County of Sarasota
- iv.Local zoning commission
- v.Local planning commission
- vi.Local permitting commission
- i.Contact utility companies and public authorities for all services and initiate approval process as needed for connection to their systems
- ii.Investigate and report on their review of all applicable local, public and utility regulations
L. GEOTECHNICAL REPORT:
- a.a. Provide a final copy of the project geotechnical report
M. ESTIMATES:
- a.Major line items costs for all building components, verify inclusion of all elements by cross checking against specification for omissions
- b.Identify escalation to mid-point of construction
- c.Update cost estimate of construction and compare it to the allowable for construction
- d.Estimate the construction period, identify any phased work and any long-lead time for special item
- e.Sole source items identified as approved
N. PROJECT SCHEDULE:
11
- a.a. Present Microsoft Project Schedule outlining Design Milestones and Major Construction activities