• Typical edge of slab details for cladding attachment
  • Special construction conditions noted (if needed)
  • Provide wind, seismic, dead and live loads design information
  • Provide accommodation for seasonal systems design - information as necessary to define construction
  • Footing, beam, column and connection details
  • Building elevations for architectural precast construction

E. MECHANICAL:

a. Floor plans

  • Size and locate utility risers, shafts, chases and equipment coordinated with architectural plans
  • Heating and cooling load criteria for each space and major duct or pipe runs sized to interface with structural and architectural building components
  • Mechanical room equipment layouts
  • Locate major equipment such as air handling units, heat pumps, exhaust fans, unit heaters, etc.
  • Locate intake and exhaust louvers
  • Locate and indicate air curtains and/or seasonal systems
  • Indicate typical layouts of all ceiling devices
  • Consider access and replacement requirements with all equipment room layouts
  • Coordinate ceiling plenum space with architectural, plumbing, fire protection, electrical and structural
  • Air and water flow diagrams showing CFM and GPM respectively
  • Show electrical requirements such as panel size, location, voltage and current requirements or mechanical equipment

F. PLUMBING/FIRE PROTECTION:

b. Sections:

c. Catalog Cuts:

  • Critical mechanical room cross sections
  • Corridor sections including duct clearances
  • Grilles and diffusers
  • Special equipment
  • Controls/Building Management Control System (BMCS)
  • Floor plans:
  • Detail plans:
  • 8
  • Size and location of utility risers, shafts, chases and equipment
  • Locate all toilets, urinals, lavatories, mop sinks, floor drains and drinking fountains