SRQ Quick Turnaround and Maintenance Facilities Sarasota Bradenton International Airport Sarasota, Florida
Revised 12.23.2020
B. ARCHITECTURAL:
a. Floor Plans:
Internal partitions drawn, located and dimensioned
All casework and other equipment called out on plans
Major mechanical/electrical systems determined and their requirements reflected and indicated on the plans including, louvers, areaways and utility entrances
Locate all plumbing fixtures in restrooms
All rooms named and numbered
Locate exterior and interior doors and windows
Locate typical and fire rated partition types
All keyed references: match lines, building sections, enlarged plans, keyed notes, etc.
Finish floor elevations noted
Expansion joints indicated (if needed)
Toilet cores drawn to larger scale (+/- 1/4"), dimensioned and keyed to larger plans
Plan and elevations of featured areas drawn to a larger scale (+/- 1/4) with all surfaces shown and called out and keyed to larger plans
Traffic topping/coating plans indicating limits
b. Reflected Ceiling Plans:
Provide a reflected ceiling plan for all finished spaces which includes:
Located lighting fixtures
Located ceiling mounted grilles/registers
Located any remaining ceiling mounted devices
Soffits/bulkheads, skylights
Identify major ceiling materials
Identify all areas with exposed structure
c. Building Elevations:
Building elevations including roof structures and foundations
Identify and locate all exterior windows and doors
Identify floor and roof levels, vertical dimensions and overall building heights
Column center lines
Locate expansion joints and major panel joints
All materials noted with demarcation of materials shown
Detailed elevations at a larger scale (+/- 1/4”) as necessary to explain design intent (entrances, special metal panels or masonry, building canopy, etc.)
Major keyed references: match lines, building sections, wall sections
Building and Wall Sections:
6