description of items to be served by emergency power and describe consideration for special areas
Design criteria defined for QTA Fueling and other required systems (vacuum, fluids, etc.)
One line plans as appropriate (fuel, fluids, vacuum, etc.)
Provide narrative and plan layout on project wayfinding requirements
Provide narrative and one-line for telecommunications/data systems
Provide narrative and one-line for security and access control systems
a. Functional analysis of site program
a. Identify specification sections and major building material systems and finishes
Life cycle cost analysis of energy conservation measures
Annual energy consumption/SF of building space
Energy analysis:
Comparison of energy source alternatives, including renewable energy
Life cycle costing for value analysis of mechanical system alternatives
Preliminary mechanical system sizing
Energy budgeting for proposed facilities
a. Provide a draft copy of the geotechnical report
Major component cost estimate, verify inclusion of elements by cross checking against outline specification for omissions and compare with budget
Identify escalation factors to mid-point of construction
Estimate construction period, identify any phased work and any long lead time for special items
4
Sole source items identified and justified
Area tabulation gross SF to net SF