- b.Site demolition and enabling plan
- c.Clear delineation of the project limit lines
- d.Preliminary spot elevations
- e.Existing utilities as noted
- f.Proposed utilities as noted
- g.Site-drainage, storm water removal or detention noted
- h.Identify the number of parking spaces and code/zoning requirements
- i.Provisions for trash disposal and removal
- j.Conformance to zoning restrictions for easements and setbacks, etc.
- k.Results of preliminary soils and boring surveys
- I.Prepare and submit land development permit (required per SMAA)
- m.If needed, environmental impact study (as an additional service)
- n.Site disturbance permit for erosion control (if needed)
B. ARCHITECTURAL BUILDING FLOOR PLANS:
- a.Plans of all floors showing structural grid, door and window locations and floor elevations
- d.Room names
- b.Key dimensions, bay sizes and overall dimensions
- c.Plan indication major extent of materials and any special conditions or equipment
- e.Preliminary finish schedule for typical areas
- f.Area summary
C. ARCHITECTURAL ROOF PLANS:
- a.Structural grid
- b.Roof material
D. ARCHITECTURAL BUILDING SECTIONS:
- a.a. Major sections through building to show relevant conditions
E. ARCHITECTURAL BUILDING ELEVATIONS:
- b.Structural grid
- c.Building to grade relationship
- d.Floor to roof and floor to ceiling height
- e.Material designations
- a.Major elevations with extent of glazing and mullion spacing indicated
- b.Major materials identified
- c.Floor lines, roof line and top of parapets indicated with dimensions
- d.Finish grades clearly shown