SRQ Quick Turnaround and Maintenance Facilities Sarasota Bradenton International Airport Sarasota, Florida
Revised 12.23.2020
Site demolition and enabling plan
Clear delineation of the project limit lines
Preliminary spot elevations
Existing utilities as noted
Proposed utilities as noted
Site-drainage, storm water removal or detention noted
Identify the number of parking spaces and code/zoning requirements
Provisions for trash disposal and removal
Conformance to zoning restrictions for easements and setbacks, etc.
Results of preliminary soils and boring surveys
Prepare and submit land development permit (required per SMAA)
If needed, environmental impact study (as an additional service)
Site disturbance permit for erosion control (if needed)
B. ARCHITECTURAL BUILDING FLOOR PLANS:
Plans of all floors showing structural grid, door and window locations and floor elevations
Room names
Key dimensions, bay sizes and overall dimensions
Plan indication major extent of materials and any special conditions or equipment
Preliminary finish schedule for typical areas
Area summary
C. ARCHITECTURAL ROOF PLANS:
Structural grid
Roof material
D. ARCHITECTURAL BUILDING SECTIONS:
a. Major sections through building to show relevant conditions
E. ARCHITECTURAL BUILDING ELEVATIONS:
Structural grid
Building to grade relationship
Floor to roof and floor to ceiling height
Material designations
Major elevations with extent of glazing and mullion spacing indicated
Major materials identified
Floor lines, roof line and top of parapets indicated with dimensions
Finish grades clearly shown
2