  • Monthly invoices, electronically submitted in PDF format to the Owner.

1.0 PROGRAMMING / PRE-DESIGN SERVICES – 10%

The determination and documentation of quantitative and qualitative expectations and basis of design for the project beyond that which has occurred to date and to be used as a baseline in subsequent schematic and design development.

Meetings

The Designer will conduct, as needed and as required, approximately four (4) web-based owner optional workshop/progress meetings and one (1) in person workshop/presentation meeting.

Deliverables

  • Summary of Project Design Criteria in electronic PDF format to the Owner.
  • Report on the Qualitative/Performance based “program” for primary components (sizing goals and planning parameters) in electronic PDF format to the Owner.
  • Summary of findings defining the scope of the project, conceptual approach and an opinion of probable construction cost in electronic PDF format to the Owner.
  • Printed copies, if requested by Owner.

1.1 Architectural Design

  • Project Definition:
  • Design Concept Validation and Project Baseline. Review and establish with Owner project design criteria, forecasts to be used, project relationship to masterplan and current/future projects, desired performance objectives relative to efficiency, sustainability, operations and maintenance.
  • Existing Site Conditions Verification and Documentation. Conduct reviews of Owner provided documents and existing reports of selected sites.

1.2 Engineering Design, all Disciplines

○ Scope and project definition

Define project elements for budgeting, scheduling & reporting

○ Obtain/review airport plans, reports & existing data

○ Initial review of overall code issues and assumptions

  • Project Definition:
  • Design Concept Validation and Project Baseline. Review and establish with Owner all engineering and system design criteria and strategies. Conduct reviews of Owner documents, record drawings and existing reports.
  • Initial review of overall code issues and assumptions. Discuss alternative procurement methods for equipment and systems.

○ Scope and project definition

Define project elements for budgeting, scheduling & reporting

○ Obtain/review airport plans, reports & existing data

○ Initial review of overall code issues and assumptions