Mr. Kent Bontrager, C.M., P.E. Sarasota Manatee Airport Authority Consolidated Rental Car Quick Turnaround and Maintenance Facilities at SRQ Revised – December 23, 2020 Page 3 of 5
operation providing exclusive-use areas for each rental car company (3 in total). A preferred option will be reviewed and selected during the initial phase of the project by project stakeholders.
EXHIBIT 3 – PROPOSED QTA OPERATIONS – SEMI-SECURED
EXHIBIT 4 – PROPOSED QTA OPERATIONS – SECURED
Included in this work is the development of the overall site and surrounding roadways, drainage, utilities, lighting, and signage.
Demolition of the existing QTA sites (Hertz, Enterprise and Storage Lot), including all vertical facilities, buildings, fuel tanks, and any site improvements, to be returned to a rough graded site. Environmental site investigation, asbestos and soils testing is included and provided by the Design Team. Any site or building remediation, if needed, will be by others.