Level of Service
Track project schedule, monitor budget, and document progress during this phase of the project. This task also includes client coordination, regular project status updates and communication, and general contract management during this phase of the project.
2. Construction Plans
Level of Service:
Incorporate review comments from the preliminary submittal, finalize the design and prepare the construction plans for bidding. Finalize the geometric layouts, edge lighting and signage layouts, paving plans, typical sections, and add applicable detail sheets and notes to a 100% stage submittal. The construction plans will be developed following applicable FAA Advisory Circulars and Specifications. The anticipated construction plan sheets to be generated are as follows:
- Cover Sheet
- Summary of Quantities and Index to Sheets
- Scope of Work
- Construction Safety and Phasing Plans
- Construction Safety Notes and Details
- Typical Sections
- Horizontal & Vertical Control Plan
- Existing Site Plan
- Removal Plan
- Paving Plan
- Paving Details
- Plan and Profile
- Stormwater Pollution Prevention Plans - Temporary
- Stormwater Pollution Prevention Plan - Permanent
- Stormwater Pollution Prevention Plan - Notes and Details
- Cross Sections
- Pavement Marking Plan
- Pavement Marking Details
- Airfield Signage Plan and Details
- Proposed Electrical Plan
- Airfield Lighting Notes
- Airfield Light Fixture Details
- Cable Splice Details Sheet
- Counterpoise Plan Details
- Duct Bank Details and Notes
- Handhole and Duct Bank Markers
- Electrical Notes
- Electrical Legend and Abbreviations
- Existing High Voltage Wiring Schematics
- Proposed High Voltage Wiring Schematics
- Legend Plate Schedules
- Grounding Notes
- Electrical Vault Plan and Details
Deliverables:
- Electronic PDF versions of the bidding construction plans will be submitted to the Airport, FAA and FDOT.