Track project schedule, monitor budget, and document progress during this phase of the project. This task also includes client coordination, regular project status updates and communication, and general contract management during this phase of the project.
Level of Service:
Incorporate review comments from the preliminary submittal, finalize the design and prepare the construction plans for bidding. Finalize the geometric layouts, edge lighting and signage layouts, paving plans, typical sections, and add applicable detail sheets and notes to a 100% stage submittal. The construction plans will be developed following applicable FAA Advisory Circulars and Specifications. The anticipated construction plan sheets to be generated are as follows:
Cover Sheet
Summary of Quantities and Index to Sheets
Scope of Work
Construction Safety and Phasing Plans
Construction Safety Notes and Details
Typical Sections
Horizontal & Vertical Control Plan
Existing Site Plan
Removal Plan
Paving Plan
Paving Details
Plan and Profile
Stormwater Pollution Prevention Plans - Temporary
Stormwater Pollution Prevention Plan - Permanent
Stormwater Pollution Prevention Plan - Notes and Details
Cross Sections
Pavement Marking Plan
Pavement Marking Details
Airfield Signage Plan and Details
Proposed Electrical Plan
Airfield Lighting Notes
Airfield Light Fixture Details
Cable Splice Details Sheet
Counterpoise Plan Details
Duct Bank Details and Notes
Handhole and Duct Bank Markers
Electrical Notes
Electrical Legend and Abbreviations
Existing High Voltage Wiring Schematics
Proposed High Voltage Wiring Schematics
Legend Plate Schedules
Grounding Notes
Electrical Vault Plan and Details
Electronic PDF versions of the bidding construction plans will be submitted to the Airport, FAA and FDOT.