The design team shall conduct a technical and plan sheet coordination review before submittal of the schematic design deliverables items.
Electronic PDF versions of the meeting note comments and markup notes will be submitted to the Airport.
The design team shall participate in a design review with Airport staff to review the schematic design plans and documents.
Deliverables:
Electronic PDF versions of the meeting note comments will be submitted to the Airport.
Level of Service
Track project schedule, monitor budget, and document progress during this phase of the project. This task also includes client coordination, regular project status updates and communication, and general contract management during this phase of the project.
Level of Service:
Develop the geometric layouts, edge lighting and signage layouts, paving and grading concepts, typical sections with pavement and base designs to a 60% stage submittal level as applicable to each individual sheet. The construction plans will be developed following applicable FAA Advisory Circulars and Specifications. The anticipated construction plan sheets to be generated are as follows:
4