APPENDIX "A"
Sarasota Bradenton International Airport
ConRAC - QTA
PGAL
Phase 1
Schematic / Design Development
Task No. Task Description Principal Sr. Struc. Eng. Struc. Eng. Sr. CAD /BIM CAD /BIM Accounting Admin Total
1.01 Kick off meeting 4 8 4 4 20
1.02 Design data compilation 2 4 8 14
1.03 Prepare narrative 2 8 0
1.04 Structural systems 4 16 0 20
1.05 Preliminary framing 4 8 8 32 32 84
1.06 Preliminary foundations 8 16 32 16 16 88
1.07 0
1.08 0
Hours Hours Hours Hours Hours Hours Hours
Subtotal Hours 24 52 56 48 48 4 4
Direct Labor (Raw Billing Rate) $196.82 $119.51 $87.03 $79.85 $58.91 $80.76 $74.44
Subtotal Direct Labor $ 4,723.68 $ 6,214.52 $ 4,873.68 $ 3,832.80 $ 2,827.68 $ 323.04 $ 297.76 $ 23,093.16
Phase 2
Construction Documents
Task No. Task Description Principal Sr. Struc. Eng. Struc. Eng. Sr. CAD /BIM CAD /BIM Accounting Admin Total
2.01 Meetings / coordination 12 32 24 8 8 4 4 92
2.02 Foundation system design 4 12 40 32 48 136
2.03 Structural framing delegated review 4 12 32 8 56
2.04 Documents production 8 32 80 100 168 388
2.05 Specifications 4 8 4 16
2.06 Prepare deliverable documents 2 4 16 24 48 94
2.07 QA/QC of deliverables 4 16 32 24 76
Hours Hours Hours Hours Hours Hours Hours
2.08 0
Subtotal Hours 38 116 224 196 272 4 8
Direct Labor (Raw Billing Rate) $196.82 $119.51 $87.03 $79.85 $58.91 $80.76 $74.44
Subtotal Direct Labor $7,479.16 $13,863.16 $19,494.72 $15,650.60 $16,023.52 $323.04 $595.52 $73,429.72
Total Direct Labor $12,202.84 $20,077.68 $24,368.40 $19,483.40 $18,851.20 $646.08 $893.28 $96,522.88