Expenses
Design Expenses
| Geotechnical Field Investigation | ||||
| Work ElementsPerform 6 hand augers to 5 feet = 30 LFPerform 4 - SPTs to a depth of 25 feet = 100 LFPerform 2 CBRs | ||||
| Item Description | Unit | Unit Price | Qty | Total |
|---|---|---|---|---|
| 612-Geo Mobilization Drill Rig Truck Mount | Each | 350.00 | 1 | 350.00 |
| Geo SPT Truck 0-50 Ft | LF | 12.90 | 100 | 1,290.00 |
| Geo Grout Boreholes- Truck 0-050 Ft | LF | 5.25 | 100 | 525.00 |
| Geo Temp Casing 3" Truck 0-050 Ft | LF | 8.50 | 40 | 340.00 |
| 401-Geo Auger Borings- Hand & Truck/Mud Bug | LF | 10.50 | 30 | 315.00 |
| 434-Geo Ground Penetrating Radar (GPR) | Day | 2,800.00 | 0.5 | 1,400.00 |
| 812-Soils Materials Finer than 200 Sieve (FM 1-T011) | Test | 42.00 | 10 | 420.00 |
| 817-Soils Moisture Content Laboratory (AASHTO T 265) | Test | 10.00 | 6 | 60.00 |
| 819-Soils Organic Content Ignition (FM 1 T-267) | Test | 42.00 | 2 | 84.00 |
| Atterberg Limit Tests (AASHTO T-89 and T-90) Combined | Test | 130.00 | 4 | 520.00 |
| 810-Soils Limerock Bearing Ratio (LBR)(FM 5-515)/CBR | Test | 340.00 | 2 | 680.00 |
| Field and Laboratory Testing | 5,984.00 | |||
1