100% Construction Documents

Project Fee Proposal - C&S Team - Summary Sheet

SRQ GA FIS Facility

SRQ SMAA Project Number: XXX

Apval-21

Scope/Task CE SET Total

Basic Design Services Hours Hours

Part I - 100's Construction Documents - Hough Engineering Inc

Submit to all ALI's required per the permit schedule for permitting. 2 2 4

Subtotal Hours 200 200 4

Rate $ 220.00 $ 140.00

Subtotal Direct Labor $ 440.00 $ 280.00 $ 720.00

Subtotal Burdened Labor @ 1.00 $ 440.00 $ 280.00 $ 720.00