Programming/Concept Design

Project Fee Proposal - C&S Team - Summary Sheet
SRQ GA FIS Facility
SRQ SMAA Project Number: XXX
April-21
Scope/TaskSGMDMMECESPEPEEngS DesignerDesignerPASADIDADTotal
Basic Design ServicesHoursHoursHoursHoursHoursHoursHoursHoursHoursHoursHoursHoursHours
Part 1 - Project Definition - C&S
Task 1Design Project Manager and necessary key design team members will attend a pre-design charrette with SRQ and CBP to review the scope of services and become familiar with the Project requirements and operational concerns during the Project's design and construction.204428846
Task 2Schedule coordination - consultant shall provide initial coordination so that project schedules are met for each phase of work included in this contract. Particular phases of design may be delayed by the FAA and FDOT review process.22
Task 3Perform a preliminary Project site inspection to further facilitate the design team with Project areas.81214429
Task 4Design Team will coordinate requirements for topographic field survey and Hyatt will perform field survey.224
Task 5Design Team will coordinate requirements for subsurface soils investigations and Tierra will perform geotechnical investigation.246
Task 6Permit schedule will be created for the items to be submitted and anticipated review times.3811
Task 7Develop report form, written document, depicting conceptual project options including narrative and sketch recommendations made during this phase for implementation within the overall design.262481464048160335
Task 8Perform internal quality control review on all design documents.42814
Task 9Setup and attend coordination meeting to discuss findings and go over report with SRQ.1214421
Task 10Review and develop written responses to all comments received.1061421
Subtotal Hours4.0087.006.0084.006.004.006.0040.00-72.00--180.00489
Rate$ 89.30$ 70.10$ 55.00$ 38.50$ 50.30$ 45.00$ 34.00$ 30.50$ 29.00$ 63.50$ 38.00$ 30.00$ 30.00
Subtotal Direct Labor$ 357.20$ 6,098.70$ 330.00$ 4,914.00$ 301.80$ 180.00$ 204.00$ 1,220.00$ -$ 4,572.00$ -$ -$ 5,400.00$ 23,577.70
Subtotal Burdened Labor @ 2.89$ 1,032.31$17,625.24$ 953.70$ 14,201.46$ 872.20$ 520.20$ 589.56$ 3,525.80$ -$13,213.08$ -$ -$15,606.00$ 68,139.55