SRQ GENERAL AVIATION FIS FACILITY SARASOTA MANATEE AIRPORT AUTHORITY
G. CONSTRUCTION ADMINISTRATION SERVICES
The specific services to be provided or furnished for this Phase of the Project are the following:
1. To be scoped and coordinated at a later date.
H. TRAVEL REQUIREMENTS
Given the scope and complexity of this project, C&S has assembled a team of experts, some which will be traveling from out of the tri-county area. The design discipline leads and various members will strategically be traveling into the Sarasota area for coordination with SRQ to attend meetings and perform field/site visits. The following assumptions and guidelines helped development of the allowances for direct expense related fees (shown in attached fee spreadsheets):
Assumed seven team members traveling once during Concept Phase and once during 90% Design phase for initial coordination/kickoff and final coordination, respectively.
Schematic Phase travel anticipated to take 3 days. Allowance accounts for overnight stay for all team members
90% Final coordination travel anticipated to take 2 days. Allowance accounts for overnight stay for all team members
Assumed three team members traveling once monthly during design for coordination meeting with SRQ