Develop detailed quantity takeoffs of all bid items to refine opinion of cost.
Final Quantity Takeoff
Finalize opinion of probable construction costs for each major element of the Project.
Opinion of Probably Construction Cost
Perform final internal quality control review on all design documents.
QA/QC documents can be submitted to SRQ upon request
Attend a final review meeting with SRQ to discuss and resolve final comments.
Meeting Minutes
Review and develop written responses to all comments received
Responses on Drawings and Specifications in PDF form
Submit to all AHJ's required per the permit schedule for permitting.
Permit Drawings and Specifications in PDF format