• DELIVERABLE • Technical Specifications

TASK 38

Perform internal quality control review on all design documents.

DELIVERABLE

  • QA/QC documents can be submitted to SRQ upon request

TASK 39

Permit schedule will be finalized for the items to be submitted and anticipated review times.

  • DELIVERABLE • Permit Schedule

Task 40

Pre-application forms and requirements will be developed in preparation for permitting.

  • DELIVERABLE • Permit Forms

TASK 41

Finalize development and evaluation of construction schedule.

  • DELIVERABLE • Construction Schedule

TASK 42

REMOVED

TASK 43

REMOVED

TASK 44