1. Finalize technical specifications.
  2. Finalize drawings and details.

Electrical

  1. Finalize coordination with other disciplines for electrical power requirements for equipment
  2. Finalize electrical requirements
  3. Finalize interior lighting layout and fixtures with ceiling and wall types
  4. Finalize exterior lighting layout and fixtures with parking lot design and wall types
  5. Finalize switch/controls requirements for each space throughout facility
  6. Finalize branch circuits (equipment, receptacles, and lighting)
  7. Finalize Panel schedules
  8. Finalize design of Stand-by generator and automatic transfer switch Communications and Security
  9. Finalize coordination with CBP and SRQ security and IT departments
  10. Finalize sizes of major communications components
  11. Finalize security system design
  12. Finalize communication system design

TASK 36

Review, Coordinate, and finalize front end specifications for bid package

DELIVERABLE

  • Front End Specifications for review

TASK 37

Finalize technical specifications manual for bid package