SRQ GENERAL AVIATION FIS FACILITY SARASOTA MANATEE AIRPORT AUTHORITY
Finalize technical specifications.
Finalize drawings and details.
Electrical
Finalize coordination with other disciplines for electrical power requirements for equipment
Finalize electrical requirements
Finalize interior lighting layout and fixtures with ceiling and wall types
Finalize exterior lighting layout and fixtures with parking lot design and wall types
Finalize switch/controls requirements for each space throughout facility
Finalize branch circuits (equipment, receptacles, and lighting)
Finalize Panel schedules
Finalize design of Stand-by generator and automatic transfer switch Communications and Security
Finalize coordination with CBP and SRQ security and IT departments
Finalize sizes of major communications components
Finalize security system design
Finalize communication system design
TASK 36
Review, Coordinate, and finalize front end specifications for bid package
DELIVERABLE
Front End Specifications for review
TASK 37
Finalize technical specifications manual for bid package