1. Finalize coordination with other disciplines
  2. Finalize plumbing fixture selections with architect and owner
  3. Provide installation details for plumbing fixtures and equipment
  4. Finalize equipment selections/capacities, and coordinate power requirements with electrical engineer
  5. Finalize routing of pipe mains throughout the facility and coordinate with other MEP infrastructure
  6. Route branch piping to all fixtures throughout the facility
  7. Finalize technical specifications, and incorporate equipment/fixture schedules into plans
  8. Review constructability and location of piping specialties for access/maintenance

Mechanical

  1. Finalize HVAC equipment and capacities based on final facility layout
  2. Finalize equipment layout in mechanical rooms, on rooftops, and on exterior of facility as necessary
  3. Finalize ductwork routing and sizes
  4. Finalize mechanical pipe routing and sizes
  5. Finalize diffuser and return locations coordinated with ceiling plan and wall layout
  6. Finalize project specific details
  7. Finalize mechanical schedules based on equipment selections
  8. Finalize energy calculations to be submitted with final design documents

Fire Protection

  1. Finalize equipment layout, sizes, and locations.
  2. Finalize hydraulic calculations.