SRQ GENERAL AVIATION FIS FACILITY SARASOTA MANATEE AIRPORT AUTHORITY
Finalize coordination with other disciplines
Finalize plumbing fixture selections with architect and owner
Provide installation details for plumbing fixtures and equipment
Finalize equipment selections/capacities, and coordinate power requirements with electrical engineer
Finalize routing of pipe mains throughout the facility and coordinate with other MEP infrastructure
Route branch piping to all fixtures throughout the facility
Finalize technical specifications, and incorporate equipment/fixture schedules into plans
Review constructability and location of piping specialties for access/maintenance
Mechanical
Finalize HVAC equipment and capacities based on final facility layout
Finalize equipment layout in mechanical rooms, on rooftops, and on exterior of facility as necessary
Finalize ductwork routing and sizes
Finalize mechanical pipe routing and sizes
Finalize diffuser and return locations coordinated with ceiling plan and wall layout
Finalize project specific details
Finalize mechanical schedules based on equipment selections
Finalize energy calculations to be submitted with final design documents
Fire Protection
Finalize equipment layout, sizes, and locations.
Finalize hydraulic calculations.