1. Establish utility service and distribution
  2. A one-line diagram will be developed with appropriate panel board sizes and feeder sizes with taking into account any voltage drop
  3. Stand-by generator and automatic transfer switch will be selected and designed
  4. Branch circuits (equipment, receptacles, and lighting) will be designed
  5. Panel schedules will be created
  6. Power distribution will be provided for all mechanical equipment for heating, cooling and ventilation, and for all communications and security
  7. Receptacles and floor boxes will be placed within the floor plan with input from CBP personnel
  8. Further Develop parking lot lighting plan and photometrics

Communications and Security

  1. Further Develop security system based on previous coordination with CBP and any comments from previous submission
  2. Further Develop communication system based on previous coordination with CBP and any comments from previous submission
  3. Coordinate with mechanical for cooling requirements for telecom room
  4. Develop routing of main above ceiling pathways
  5. Coordinate with CBP and SRQ security and IT departments for connection routing and requirements
  6. Finalize sizes of major communications components

TasK 26

Develop preliminary front end specifications by reviewing SRQ provided Division 0 and Division 1 documents.

DELIVERABLE

  • Preliminary Front End Specifications for review