- Establish utility service and distribution
- A one-line diagram will be developed with appropriate panel board sizes and feeder sizes with taking into account any voltage drop
- Stand-by generator and automatic transfer switch will be selected and designed
- Branch circuits (equipment, receptacles, and lighting) will be designed
- Panel schedules will be created
- Power distribution will be provided for all mechanical equipment for heating, cooling and ventilation, and for all communications and security
- Receptacles and floor boxes will be placed within the floor plan with input from CBP personnel
- Further Develop parking lot lighting plan and photometrics
Communications and Security
- Further Develop security system based on previous coordination with CBP and any comments from previous submission
- Further Develop communication system based on previous coordination with CBP and any comments from previous submission
- Coordinate with mechanical for cooling requirements for telecom room
- Develop routing of main above ceiling pathways
- Coordinate with CBP and SRQ security and IT departments for connection routing and requirements
- Finalize sizes of major communications components
TasK 26
Develop preliminary front end specifications by reviewing SRQ provided Division 0 and Division 1 documents.
DELIVERABLE
- Preliminary Front End Specifications for review