SRQ GENERAL AVIATION FIS FACILITY SARASOTA MANATEE AIRPORT AUTHORITY
Establish utility service and distribution
A one-line diagram will be developed with appropriate panel board sizes and feeder sizes with taking into account any voltage drop
Stand-by generator and automatic transfer switch will be selected and designed
Branch circuits (equipment, receptacles, and lighting) will be designed
Panel schedules will be created
Power distribution will be provided for all mechanical equipment for heating, cooling and ventilation, and for all communications and security
Receptacles and floor boxes will be placed within the floor plan with input from CBP personnel
Further Develop parking lot lighting plan and photometrics
Communications and Security
Further Develop security system based on previous coordination with CBP and any comments from previous submission
Further Develop communication system based on previous coordination with CBP and any comments from previous submission
Coordinate with mechanical for cooling requirements for telecom room
Develop routing of main above ceiling pathways
Coordinate with CBP and SRQ security and IT departments for connection routing and requirements
Finalize sizes of major communications components
TasK 26
Develop preliminary front end specifications by reviewing SRQ provided Division 0 and Division 1 documents.
DELIVERABLE
Preliminary Front End Specifications for review