- Develop routing of piping mains based on previous calculations and coordinate with foundation plans
- Coordinate layout of plumbing fixtures with architect
- Develop technical specifications in accordance with building programming
Mechanical
- Finalize sizes for HVAC equipment based on load calculations
- Coordinate with vendors and finalize unit selections for HVAC equipment
- Ductwork and mechanical pipe routing will be further developed to provide necessary cooling/heating
- Coordinate with Architectural for ceiling and floor plan layout
- Diffuser and return locations will be indicated with preliminary airflow rates
- Develop project specific details
- Provide updated mechanical schedules based on equipment selections
- Finalize electrical loads for equipment and coordinate with Electrical
- Develop preliminary energy calculations.
Fire Protection
- Develop sprinkler coverage area and layout
- Develop sprinkler pipe routing
- Develop fire alarm and notification device layout
- Develop fire alarm sequence of operations matrix
- Develop fire protection systems technical specifications
- Coordinate interfaces with mechanical and electrical systems
Electrical
- 1. Finalize electrical load requirements