1. Develop routing of piping mains based on previous calculations and coordinate with foundation plans
  2. Coordinate layout of plumbing fixtures with architect
  3. Develop technical specifications in accordance with building programming

Mechanical

  1. Finalize sizes for HVAC equipment based on load calculations
  2. Coordinate with vendors and finalize unit selections for HVAC equipment
  3. Ductwork and mechanical pipe routing will be further developed to provide necessary cooling/heating
  4. Coordinate with Architectural for ceiling and floor plan layout
  5. Diffuser and return locations will be indicated with preliminary airflow rates
  6. Develop project specific details
  7. Provide updated mechanical schedules based on equipment selections
  8. Finalize electrical loads for equipment and coordinate with Electrical
  9. Develop preliminary energy calculations.

Fire Protection

  1. Develop sprinkler coverage area and layout
  2. Develop sprinkler pipe routing
  3. Develop fire alarm and notification device layout
  4. Develop fire alarm sequence of operations matrix
  5. Develop fire protection systems technical specifications
  6. Coordinate interfaces with mechanical and electrical systems

Electrical

  1. 1. Finalize electrical load requirements