Develop routing of piping mains based on previous calculations and coordinate with foundation plans
Coordinate layout of plumbing fixtures with architect
Develop technical specifications in accordance with building programming
Finalize sizes for HVAC equipment based on load calculations
Coordinate with vendors and finalize unit selections for HVAC equipment
Ductwork and mechanical pipe routing will be further developed to provide necessary cooling/heating
Coordinate with Architectural for ceiling and floor plan layout
Diffuser and return locations will be indicated with preliminary airflow rates
Develop project specific details
Provide updated mechanical schedules based on equipment selections
Finalize electrical loads for equipment and coordinate with Electrical
Develop preliminary energy calculations.
Develop sprinkler coverage area and layout
Develop sprinkler pipe routing
Develop fire alarm and notification device layout
Develop fire alarm sequence of operations matrix
Develop fire protection systems technical specifications
Coordinate interfaces with mechanical and electrical systems
1. Finalize electrical load requirements