The Design Development Phase is intended to expand on the selected alternative identified during the Schematic Design Phase to provide realistic design that all stakeholders can review and evaluate based on the facility needs.
The Project's design will take advantage of local knowledge and experience and will utilize expertise from recent construction projects in an effort to design a cost-effective Project. The specific services to be provided or furnished for this Phase of the Project are as follows:
Schedule coordination - consultant shall provide continued coordination so that project schedules are met for each phase of work included in this contract. Particular phases of design may be delayed by the FAA and FDOT review process.
Updated Written Schedule
Prepare Design Development (60%) Drawings incorporating pertinent design aspects of the project and surrounding site.
Drawings include phasing coordination to ensure that this renovation shall not impact the operation of the airport.
Stakeholders input will be incorporated as necessary to verify phasing and lay-out will meet SRQ requirements
Design Development Drawings (60%) to SRQ for review and comment
1. Perform project management duties such as project planning, invoice preparation, and coordination of design team.