data sheets
- Coordinate with Architectural to identify space requirements
- Establish approximate sizes of major communications components
- Identify clearances and chases required
TASK 16
Perform internal quality control review on all design documents.
DELIVERABLE
- QA/QC documents can be submitted to SRQ upon request
TASK 17
Develop an outline of front end and technical specifications.
DELIVERABLE
- Outline of Front End and Technical Specifications
TasK 18
Preliminary development and evaluation of construction schedule.
DELIVERABLE
- Preliminary Construction Schedule
TASK 19
Perform a preliminary quantity takeoff of all bid items.
DELIVERABLE
- Preliminary Quantity Takeoff
TASK 20
Prepare preliminary opinion of probable construction costs for each major element of the Project.
DELIVERABLE
- Preliminary Opinion of Probably Construction Cost