data sheets

  1. Coordinate with Architectural to identify space requirements
  2. Establish approximate sizes of major communications components
  3. Identify clearances and chases required

TASK 16

Perform internal quality control review on all design documents.

DELIVERABLE

  • QA/QC documents can be submitted to SRQ upon request

TASK 17

Develop an outline of front end and technical specifications.

DELIVERABLE

  • Outline of Front End and Technical Specifications

TasK 18

Preliminary development and evaluation of construction schedule.

DELIVERABLE

  • Preliminary Construction Schedule

TASK 19

Perform a preliminary quantity takeoff of all bid items.

DELIVERABLE

  • Preliminary Quantity Takeoff

TASK 20

Prepare preliminary opinion of probable construction costs for each major element of the Project.

DELIVERABLE

  • Preliminary Opinion of Probably Construction Cost