Coordinate with Architectural to identify space requirements
Establish approximate sizes of major communications components
Identify clearances and chases required
Perform internal quality control review on all design documents.
QA/QC documents can be submitted to SRQ upon request
Develop an outline of front end and technical specifications.
Outline of Front End and Technical Specifications
Preliminary development and evaluation of construction schedule.
Preliminary Construction Schedule
Perform a preliminary quantity takeoff of all bid items.
Preliminary Quantity Takeoff
Prepare preliminary opinion of probable construction costs for each major element of the Project.
Preliminary Opinion of Probably Construction Cost