Fire Protection
- Develop appropriate fire protection (fire suppression, alarm, and detection) strategy based on occupancy and construction type.
- Perform water supply analysis to determine quality of available water supply.
- Coordinate equipment layout and locations.
Electrical
- Determine electrical load requirements (i.e. 208/120V, Single-phase/Three-Phase or 480/277V, Three-phase)
- Determine voltage availability in the area from the electrical utility
- Coordinate any utility infrastructure needs with the utility company (i.e. - utility switches, transformers, utility poles, etc.)
- Design major equipment components (panel boards, transformers, lighting, and appliance panels) within the electrical spaces with adherence to the National Electrical Code minimum requirements for clearances
- Determine preliminary panel board sizes
- For interior lighting, the team will select preliminary luminaires and perform preliminary photometric calculations
- Develop preliminary parking lot and exterior lighting plan and photometrics
- Provide preliminary CBP switching requirements to appropriate areas and rooms. Remaining spaces will adhere to energy code requirements
Communications and Security
- Develop preliminary security system based on coordination with CBP requirements, to include video surveillance system, access control, system, intrusion detection system with a duress
- Develop preliminary communication system based on coordination with CBP requirements
- Review communication/security-specific requirements related to CBP room