Develop appropriate fire protection (fire suppression, alarm, and detection) strategy based on occupancy and construction type.
Perform water supply analysis to determine quality of available water supply.
Coordinate equipment layout and locations.
Determine electrical load requirements (i.e. 208/120V, Single-phase/Three-Phase or 480/277V, Three-phase)
Determine voltage availability in the area from the electrical utility
Coordinate any utility infrastructure needs with the utility company (i.e. - utility switches, transformers, utility poles, etc.)
Design major equipment components (panel boards, transformers, lighting, and appliance panels) within the electrical spaces with adherence to the National Electrical Code minimum requirements for clearances
Determine preliminary panel board sizes
For interior lighting, the team will select preliminary luminaires and perform preliminary photometric calculations
Develop preliminary parking lot and exterior lighting plan and photometrics
Provide preliminary CBP switching requirements to appropriate areas and rooms. Remaining spaces will adhere to energy code requirements
Develop preliminary security system based on coordination with CBP requirements, to include video surveillance system, access control, system, intrusion detection system with a duress
Develop preliminary communication system based on coordination with CBP requirements
Review communication/security-specific requirements related to CBP room