1. Develop preliminary size of major structural framing members
  2. Coordinate critical clearance requirements with architectural and MEP systems

Plumbing

  1. Work with the architect to develop the appropriate plumbing fixture count
  2. Review plumbing-specific requirements related to CBP room data sheets
  3. Review building type, occupancy, and perform overall code analysis related to plumbing systems
  4. Calculate fixture units and rationalize flow rates
  5. Translate overall fixture units/flow rates into pipe sizes for utility mains

Mechanical

  1. Perform load calculations and outdoor air ventilation calculations for proposed layout
  2. Develop preliminary sizes for HVAC equipment based on load calculations
  3. Provide preliminary selections for necessary HVAC equipment including:
  4. Air handling equipment (roof top or ground mounted).
  5. Exhaust fans
  6. Wall/roof openings (if required)
  7. Incorporate preliminary selections, locations, and schedules for the above equipment into drawings
  8. Coordinate roof openings, clearances, and/or chase requirements with the Architectural/Structural team
  9. Coordinate electrical load of equipment with Electrical Engineering team
  10. Initial main duct runs & diffuser/grille layout will be developed in accordance with the floor plan layout